Filter results by:
Key Findings
Questions we Asked
Geographic Area

Search for the following document types:

Approve Lake Superior Plan 2012

The Lake Superior regulation plan defines the rules for operating the structures on the St. Marys River used to control the outflow from Lake Superior. After an exhaustive review of a large number of regulation plans, a plan known as NatOpt3 during the extensive plan formulation and evaluation process was found to provide the best performance as measured by a number of performance metrics and under a number of scenarios. Plan NatOpt3 was subsequently renamed Lake Superior Regulation Plan 2012, and is recommended as the replacement for Plan 1977A.
Related Projects
Stochastic NBS
Paleo-reconstructed NBS
MESH Component NBS
Analysis of Angel and Kunkel Future Lake Levels and NBS
Climate Data Downscaling using CRCM
Modelling of Climate Change Impacts Using CHARM
Stochastic Generation and Forecasting of NBS
Hydroclimate Synthesis and Summary
Impacts of Fluctuations in Levels and Flow Rates
Assessment of Present and Future Water Uses
Simulation of Consumptive Use Impacts on Water Levels
Water Uses Performance Indicators
Water Uses Synthesis and Summary
Electricity Price Forecasts
Hydropower Regression Relationships
Hydropower Performance Indicators
Hydropower Synthesis and Summary
Commercial Navigation Coping Zones
Commercial Navigation Performance Indicators
Commercial Navigation Summary
Rec Boating Literature Review & Marina Slip Field Measurements
Tourism Assessment as Influenced by Water Levels
Recreational Boating Coping Zones
Recreational Boating Performance Indicators
Recreational Boating Synthesis and Summary
Low Water Impact Analysis
Flooding Impact Analysis
Shore Protection Impact Analysis
Erosion Impact Analysis
Coastal Zone Performance Indicators
Coastal Zone Adaptive Management Needs
Coastal Zone Synthesis and Summary
St. Marys River Ecosystem Evaluation
Integrated Ecosystem Response Model
Ecosystem TWG Synthesis and Summary
Risk Assessment & Decision Making under Uncertainty
Plan Formulation and Evaluation Strategy
Shared Vision Modelling
Lake Superior Fencepost Plans
Lake Superior Plan Formulation
Required Revision to Orders of Approval